From first sketch to final handover.

Seven stages. Zero surprises. Everything documented.

A great kitchen or bathroom isn’t built by accident. Every PlanBuild project follows a structured 7-stage process — with clear timelines, defined responsibilities, quality checkpoints, and complete transparency from day one to handover.

7

Defined Stages

4–6 wk

Average Timeline

3 Year

Workmanship Warranty

Structure is what separates a great build from a costly mistake.

In Chittagong’s renovation market, most projects fail not because of bad materials — but because of bad process. No documentation, no defined responsibilities, no quality gates. We fixed that with a 7-stage system that protects you at every step.

Documented at Every Stage

Photos, reports, and client sign-offs at every checkpoint. No ambiguity, no disputes.

One Project Manager, One Number

You don't chase 5 contractors. One dedicated PM handles everything and answers your calls.

Milestone-Based Payments

40% advance, 40% mid-project, 20% on handover. You never pay for unfinished work.

See It Before We Build It

Photorealistic 3D renders at stage 2. You approve every angle, finish, and material before demolition.

Every project, broken down.

Each stage has clear deliverables, defined responsibilities, and a quality checkpoint before we move forward.

01

Discovery & Site Visit

Free on-site visit, laser measurements, photo documentation, structural and plumbing assessment, lifestyle consultation, and initial budget guidance.

02

Design & 3D Visualization

2–3 layout options, photorealistic 3D renders from multiple angles, physical material samples, lighting plan, and up to 3 revision rounds.

03

Material Selection & Quote

Final material specs locked in. Detailed itemized quote listing every brand, model, and grade. Civil, plumbing, and electrical scope all priced transparently.

04

Approval & Scheduling

Contract signing, 40% advance, dedicated PM assignment, material ordering, and confirmed start date. Every detail committed in writing.

05

Build & Installation

Demolition, civil work, plumbing, electrical, waterproofing, tiling, cabinetry, and all hardware. Weekly photo updates throughout.

06

Quality Control & Testing

Internal QC before client walkthrough. Functional tests, 24-hour water ponding for bathrooms, snag list, surface review — all documented.

07

Handover & Warranty

Deep clean, usage walkthrough, warranty documents, care instructions. 5-year workmanship warranty issued. 30-day follow-up included.

Exactly what happens, and who does what.

Every stage has defined responsibilities for our team and for you — so there’s never any confusion about what’s happening or who’s accountable.

01

Discovery & Site Visit

Week 1 — Day 1–3

Every great project starts with understanding. We come to your home, listen to how you live, measure the space precisely, and assess structural, plumbing, and electrical conditions before recommending anything.

Site Assessment Report

Measurement Drawings

Initial Budget Range

Project Brief Document

02

Design & 3D Visualization

Week 1–2

Our designers translate your brief into photorealistic 3D renders. You see every angle, finish, and material before approving anything.

2–3 Layout Options

3D Renders (8–12 views)

Material Board

Final Approved Design

Technical Drawings

03

Material Selection & Quote

Week 2

Final material picks are locked in. You receive an itemized quote with brand, model, and grade clearly listed for every line item — no hidden costs.

Itemized Quote (PDF)

Material Specifications

Payment Schedule

Project Timeline

04

Approval & Scheduling

Week 2–3

Contract signing, advance payment, and detailed project scheduling. We assign your dedicated project manager and lock in the start date.

Signed Contract

Project Manager Contact

Detailed Schedule

Start Date Confirmation

05

Build & Installation

Week 3–5

The construction phase. Civil work, plumbing, electrical, fabrication, and installation — all coordinated by your project manager with weekly updates.

Weekly Progress Photos

Civil Completion Sign-off

Plumbing Pressure Test

Waterproofing Curing Report

Installation Complete

06

Quality Control & Testing

Week 5–6

Before handover, every detail is verified. Functional testing, finish inspection, snag list creation, and resolution before client walkthrough.

QC Report

Snag List (Resolved)

Functional Test Results

Leak Test Certificate

07

Handover & Warranty

Week 6

Final cleaning, walkthrough demonstration, warranty documents, and care instructions. We hand you the keys to your new space — and stay available throughout the warranty period.

5-Year Warranty Certificate

Manufacturer Warranties

Care Instructions

30-Day Check-In

Why this process protects you.

In a market full of “everything-fixed” contractors and broken timelines, our structured process is your insurance.

01

Documentation at Every Stage

Photos, reports, and sign-offs at every checkpoint. If anything goes wrong, there's no "he said, she said" — everything is recorded.

02

One Project Manager, One Number

You don't chase 5 different contractors. One dedicated PM handles everything and answers your calls — even on weekends during the project.

03

Milestone-Based Payments

40% advance, 40% mid-milestone, 20% on handover. You never pay for work that hasn't been completed and verified.

04

No Variation Surprises

Any scope change is quoted and approved before work proceeds. You'll never get a "by the way, this will cost extra" call mid-project.

05

Quality Gates Before Each Stage

We don't move forward until the previous stage passes QC. This prevents covering up problems — the most common failure mode in this industry.

06

Post-Handover Accountability

A 5-year workmanship warranty isn't just a piece of paper. We come back when called. Most of our work comes from referrals — that doesn't happen if we walk away.

Things people ask us about how we work.

How long does the full design-build process take?

From the first site visit to handover, a typical kitchen project takes 4 to 6 weeks and a typical bathroom takes 3 to 5 weeks. Larger or more complex projects can extend to 8 weeks. We share a detailed timeline upfront, lock it in the contract, and track it weekly.

Clients provide site access, basic requirements and style preferences, design approvals at key milestones, payment as per the agreed schedule (40%/40%/20%), and final walkthrough confirmation. Everything else — design, materials, civil, plumbing, electrical, installation, cleanup, and handover documentation — is handled by our team. You can be as involved or hands-off as you’d like.

Standard Essential packages include 2 rounds of design revisions. Premium tier includes 3 revisions plus a walkthrough. Luxury tier includes unlimited revisions plus VR walkthrough. In practice, most projects converge within 2 rounds because we invest in understanding requirements properly in stage 01.

We conduct quality checks at 5 critical stages: (1) material delivery inspection, (2) post-civil work review, (3) post-waterproofing verification with 24-hour water ponding test (for bathrooms), (4) pre-handover snag inspection, and (5) final functional testing. Each is documented with photos shared with the client.

Handover includes deep cleaning, protective film removal, client walkthrough with usage demonstration of every fitting and feature, snag list creation and resolution within 7 days, all warranty documents and care instructions, and a 30-day check-in. Our team remains available throughout the warranty period for service support.

Minor changes can be accommodated even after approval — like swapping a hardware colour or moving an outlet position. But major changes (layout shifts, structural changes, material upgrades) may require re-quoting and may extend the timeline. Any approved change comes with a written variation order so there are no surprises.

Delays caused on our side are our problem — we absorb them and keep working until completion. Delays caused by external factors (client decision delays, material import customs, building society restrictions) are flagged immediately and the timeline is recalibrated with client awareness. In 4+ years of operations, our average completion is within 5–7 days of the committed timeline.

Standard work happens Saturday through Thursday, 9 AM to 6 PM (we follow Bangladesh weekend). Friday is off for the workforce. If your building society has noise restrictions or specific hours, we adjust accordingly. For critical milestone work or to compress timelines, we can arrange extended hours with prior agreement.

Ready to start with a team that's accountable?

Book your free site visit. We’ll walk you through our process in person, answer every question, and share a custom 3D design preview — no commitment, no pressure.

Call or WhatsApp

Get a free consultation

Fill the form and we'll get back within 24 hours.

Get a Quote Form

Get a free consultation

Fill the form and we'll get back within 24 hours.

Get a Quote Form